'extracting material from warehouse based on the production plan in anylogic
I am a beginner in anylogic and I am modeling production process in which there are several different raw materials (defined as agents e.g. metal sheet A, metal sheet B, etc.) they are going through the process and create several types of final products… therefor I have to inject the materials based on production plan and store them in warehouse and then get them out of the warehouse according to the production plan and BOM of the product.
Let’s say that the situation is that Any logic should check the production plan hourly and inject the agents to the model according to that production plan. Here is a part of injection plan according to my monthly production plan. (I have this plan for 1 month and I want to simulate it.)
My question is that how can I set this production plan for anylogic to inject the materials to the model.
Sources
This article follows the attribution requirements of Stack Overflow and is licensed under CC BY-SA 3.0.
Source: Stack Overflow
| Solution | Source |
|---|

