'Value too great for base (error token is "09")
When running this part of my bash script am getting an error
Script
value=0
for (( t=0; t <= 4; t++ ))
do
d1=${filedates[$t]}
d2=${filedates[$t+1]}
((diff_sec=d2-d1))
SEC=$diff_sec
compare=$((${SEC}/(60*60*24)))
value=$((value+compare))
done
Output
jad.sh: line 28: ((: 10#2014-01-09: value too great for base (error token is "09")
jad.sh: line 30: /(60*60*24): syntax error: operand expected (error token is "/(60*60*24)")
d1 and d2 are dates in that form 2014-01-09 and 2014-01-10
Any solution please?
Solution 1:[1]
Prepend the string "10#" to the front of your variables. That forces bash to treat them as decimal, even though the leading zero would normally make them octal.
Solution 2:[2]
What are d1 and d2? Are they dates or seconds?
Generally, this error occurs if you are trying to do arithmetic with numbers containing a zero-prefix e.g. 09.
Example:
$ echo $((09+1))
-bash: 09: value too great for base (error token is "09")
In order to perform arithmetic with 0-prefixed numbers you need to tell bash to use base-10 by specifying 10#:
$ echo $((10#09+1))
10
Solution 3:[3]
As others have said, the error results from Bash interpreting digit sequences with leading zeros as octal numbers. If you have control over the process creating the date values and you're using date, you can prefix the output format string with a hyphen to remove leading zero padding.
Without prefixing date format with hyphen:
$ (( $(date --date='9:00' +%H) > 10 )) && echo true || echo oops
-bash: ((: 09: value too great for base (error token is "09")
oops
With prefixing date format with hyphen:
$ (( $(date --date='9:00' +%H) > 10 )) && echo true || echo oops
true
From the date man page:
By default, date pads numeric fields with zeroes. The following optional flags may follow '%':
- (hyphen) do not pad the field
Solution 4:[4]
d1 and d2 are dates in that form 2014-01-09 and 2014-01-10
and then
((diff_sec=d2-d1))
What do you expect to get? ((diffsec=2014-01-09-2014-01-10)) ??
You need to convert the dates to seconds first:
d1=$( date -d "${filedates[$t]}" +%s )
d2=$( date -d "${filedates[$t+1]}" +%s )
(( compare = (d2 - d1) / (60*60*24) ))
(( value += compare ))
Solution 5:[5]
You don't need the $ and the {} in an arithmetic expansion expression. It should look like this:
compare=$((SEC/(60*60*24)))
Solution 6:[6]
For 'mm' and 'dd' values in dates, I use this trick:
mm="1${date:5,2}" # where 5 is the offset to mm in the date
let mm=$mm-100 # turn 108 into 8, and 109 into 9
Sources
This article follows the attribution requirements of Stack Overflow and is licensed under CC BY-SA 3.0.
Source: Stack Overflow
| Solution | Source |
|---|---|
| Solution 1 | rojomoke |
| Solution 2 | dogbane |
| Solution 3 | |
| Solution 4 | glenn jackman |
| Solution 5 | hek2mgl |
| Solution 6 | Dick Guertin |
