'SAC Model - Is it possible to change from an Analytic Model to a Planning model?
I have an analytic model in SAC and I would like to change this to a planning model. There is already data loaded. I tried going into the settings and turning on the Planning capabilities but it does not let me. Are there any prerequisites in order for this to successfully be changed into a Planning model or do I have to start over?
Sources
This article follows the attribution requirements of Stack Overflow and is licensed under CC BY-SA 3.0.
Source: Stack Overflow
| Solution | Source |
|---|
